Manual

Assembty
ASSEMBLED TEE RAIL
WITH TROLLEY
'i6x_t6 LG BOLT
OPERATOR
CHASSIS
INSTALL CHAIN: Insert a screwdriver or nail in the hole in
Tee rai! located about 6 inches back of the sprocket bracket,,
Slide trolley to this point
Thread one of the 5/16 inch nuts onto the trolley stud Fasten
one end of the chain to the fiat end of the t_'olley stud using a
master link from the coin envelope included in the assembly
hardware box,
CAUTION: Keep the chain taut white unwinding it to prevent
kinking
Extend the chain around the idler sprocket bracket, Proceed
back around the small sprocket on the operator, then forward
to the trolley Make certain that teeth from each sprocket
engage the chain
5
ATTACH ASSEMBLED TEE RAIL TO OPERATOR: Place
operator on packing material to avoid scratching cover,, Align
two holes in motor end of Tee rail with holes in operator
chassis an illustrated, For convenience, place a support under
sprocket bracket Fasten Tee rail to operator with two washered
screws 5/16 inch by 9/16 inch Tighten securely,
5/I6 NUT
SCREWDRIV
SPROCKET
BRACKET
\TROLLEY
BRACKET
TROLLEY STUD
FLAT END
MASTER
LINK
LARGE
SPROCKET
SMALL
SPROCKET
CAUTION: Tile chain retainer bracket should be kept in the
illustrated position during assembiy_
DLER
SPROCKET
J
MASTER
LINK
RETAINER BRACKET
DC_WASHER _6
CHiN STUb
TROLLEY
Connect the chain to the chain retainer bracket using the second
master tink in the coin envelope Slide the chain retainer bracket
onto the chain stud as illustrated Secure it to the stud with
the second 5/16 inch nut and lock washer,,