Operator`s manual
Makesureall cablesare routedto the leftof the chutecontrolrod.
Lineupthe holein the rodwiththe arrowonthe inputshaftand
insertthe rodintothe inputshaftbelowjoystickonhandlepanel.
SeeFigure7.
NOTE:The chutecontrolrodwill fit snugglyintothe inputshaft.
Supportthe rearof the dashpanelwithone handwhileinsertingthe
rodwithyourother handto ensurethe rodis insertedallthe way into
the inputshaft.
8. Nowpushthechutecontrolrodbacktowardsthe handlepanel
untilthe holein the rodlinesupwiththe holein thechutecontrol
inputclosestto the chutecontrolhead.Insertthecotter pin.See
Figure8.
NOTE:The secondholeis usedto achievefurtherengagementof the
chutecontrolrodintothe inputshaft if requiredandcan be usedlater
for adjustmentif thechutedoesnot fullyrotate.Referto the Service&
Maintenancesectionfor ChuteControlRodadjustments.
9. Finishsecuringchutecontrolheadto chutesupportbracketwith
wingnut,andclevispinand bow-tiecotter pinremovedearlier.Do
notovertighten.SeeFigure9.
Figure8
\
y..................
Figure7
Figure9
10