Warranty Duration All parts of this faucet system are warranted t the original purchaser to be free from defects in material and workmanship for a lifetime. Repair and Replacement if the product has defects In material and workmanship within ths warranty period, we will repair or replace the product free of charge. However you may ba required fo provide the invoice when requesting repairs of replacement farm us.
+ Installation and maintenance matters 1.Check the accessories list to verify that all parts are complete in this package. 2.00 not disassemble the main body by yourself. 3. Connect Inlet pipes to supply valves. Mintaka sure inlet pipes and supply valves have no impurities and are cleaned, with no impurities in the pipeline, 5. After installation, check all joints for leakages. 6.00 not leave the rain shower system exposed to a severely corrosive environment.
+ 2-function Rain Shower System Model:A Accessories List Fart name Qty | No. Part name Qty 11 Shower head 1 9 | Handle 1 2] Shower arm 1.1.
+ Essential dimensions & water pipe line Que Head shows Unit: machine SIESTA 316" 1100-4 300me Hot water infer Finish surface > — ars SASS SSS » The installation depth of shower holder and shower arm. Site wall The wal | Hand shower holder Lz > 20mm 34° Bry wal} Drywall The thickness of the tle must be calculated for installation.
+ Installation Depth Of Main Body 2918 {Sliminess File wall Bry wall Depth 215/16° (maxima Notice: 1. The installation depth of the main body should be no less than 2 9/16" (8mm) and no more than 2 15/18° (F8mm), including the thickness of the tile. Otherwise, the deck plats cannot be installed. 2. The opening size of ceramic tile shall be smaller than the deck plate size. + Piping Instructions Before Tiling HPT 1 Hot water Hat waiter inlet pipe BT 1 old water inlet pipe 1.
+ Main Body Valve Installation {concrete vied} fwd wall) 1. Make marks according to the dimensions of the main body valve, then dill anchors into the wall tor a concrete wall), 2. Becure the main body directly 10 a wood wall using screws. 3. When installing the main body, ensure the "UP® side is facing upwards; do nat install it upside down, A Please note: The love! meter should be parallel to the wall; otherwise, the deck plate cannot be installed properly.
+ Z-function Rain Shower System Mode Accessories List No. Fart name Qty | No. Part name Qty 1 | Shower head 1 10 | Deck plate 1 2 | Shower arm 1 11 | Main body 1 3 | Shower arm cup 1 12" | Handle parts 1 4 | Hand shower holder Main body spare parts 4 5 | Holder cup 11 14 instruction manual 1 Shower hand 1. 115 | Gloves Z 7 | Shower hose 1 14 | Bathtub spout 1 8 | Water diverted 1 17 | Bathtub spout cover 1 9 | Handle 1.1.
#» Essential dimensions & water pipe line Rear Mead shower Units munchkin Fe A 4200-15 0mm) ALBA 3167 £4165.4300me; Finish surf ans a yay aay TILES « The Installation depth of shower holder and shower arm. 1 Tile wall { rite wall Tia Walt | Hand shower holder Peshawar arm Stone atm, Lem 2mm mms Drywall Bret wal Fern i The thickness of the tile must be calculated for installation. Connector size of male threads USA: 1/2" KANPUR, Canada 1/2 140PT, Europe: G1/2°.
+ Installation Depth Of Main Body 2918 {Sliminess File wall Bry wall Depth 215/16° (maxima Notice: 1. The installation depth of the main body should be no less than 29/16” (65mm) and na more than 2 15/16” (FBmm), including the thickness of th tile. Otherwise, the deck plats cannot be installed. 2. The tapering size of ceramic tile shall be smaller than the deck plate size. + Piping Instructions Before Tiling HPT 12 1 Hat water Hat waiter inlet pipe BT 1 old water inlet pipe 1.
+ Main Body Valve Installation tad wally 1. Make marks according to the dimensions of the main body valve, then dill anchors into the wall tor a concrete wall), recurred the main body directly 10 2 wood wall using screws. 3. When installing the main body, ensure the "UP® side is facing upwards; do nat install it upside down, A Please note: The love! meter should be parallel to the wall; otherwise, the deck plate cannot be installed properly.
+ The installation of the overhead shower. [Model A&B} Female thread elbow t. Lonnect shower arm with the cover before screwing arm inch tires connection te prevent damage. 2. Bix shower head onto shower arm and apply tape to pipe threads on both ends. 3.00 not over tighten shower head, it 1s 360° swivel contention. + installation The Hand Show Holder{Model (ASE) Step Step Step! Sta pd Flange Female thread g ride elbow Sap] Straw the thread into the water pips inside the wall Step. .
# Install The Yub Spout Step’: Connect the copper connector to the bathtub spout and wrap it with waterproof tape. Sap; install the round decorative cover, Step: Rotate the bathtub spout to connect with the internal thread on the wall.
+ Instalación y cuestiones de mantenimiento 1.Verifique la lista de accesorios para comprobar que todas las partes estén completas en este paquete, 2 No desmonte el cuerpo principal por sf mismo. 3 onece las tuberías de entrada a las válvulas da suministro, 4. Aseglrese de que las tuberías de entrada v las válvulas de suministro no tengan impurezas y estén implas, sin impurezas en la tubería. desprender ce la instalación, revise todas las juntas en busca de fugas. 6.
+ Sistema de ducha de Luvia con 2 funciones Modelo: A Lista de Accesorios No. Far mane Qty | No.
+ Instalación de la Válvula del Cuerpo Principal {pared de madera) {Parad de concrete) 1.Marque según ef mafioso de fs valvas del cuerpo principal y luego perfore para colocar fos anclajes en la pared {pared de concrete). 2.Fije directamente of cuerpo principal s a madera con torillos (pared de madera). 3. Alinstatar of cueros principal, por favor marque ef lado UP hacia arriba y no lo instaba al revés.
Sistema de ducha de Luvia con 3 funciones Modelo: B Lista de Accesorios No. Far mane Qty | No.
+ Instalación de la Válvula del Cuerpo Principal {Pared de concreto) {pared de nadara) 1.Marque según ef mafioso de fs valvas del cuerpo principal y luego perfore para colocar fos anclajes en la pared {pared de concrete). 2.Fije directamente of cuerpo principal s a madera con torillos (pared de madera). 3. Alinstatar of cueros principal, por favor marque ef lado UP hacia arriba y no lo Estaban al revés.
+ Instalar el grifo de la batiera Fl Paso 1:Conecte el conector de cobre al grifo de la batear y envuélvalo con cinta impermeable. Paso Instale la cubierta decorativa redonda, Paso 3:Gire el grifo de la basara para conectarlo con la rosea Interna en la pared.