User manual

Table Of Contents
1. On the Project Tab (see Figure H-2), enter Dive 0 (the start of the initial MMP
dive to the bottom). Use the calendar icon or type the date and time directly.
NOTE
Project Settings show the project name and description, number of profiles and patterns, and
when SCHEDULE.DPL was initially created and last created.
Project
Information
Instrument
Configuration
for battery
endurance
estimate
Dive 0 Time
Figure H-2: Deployment Planner Project Tab
2. Select the Instrument Configuration.
IMPORTANT
Instrument Configuration is used only to calculate estimated battery endurance in the
Deployment Planner. Actual deployment sensors must be configured in the MMP firmware.
NOTE
Inductive Telemetry must be selected if inductive telemetry profiles will be defined.
H-2