User manual
Table Of Contents
- Chapter 1Introduction
 - Chapter 2 Mechanical Description
 - Chapter 3 Electronic Description
 - Chapter 4 Maintenance and Storage
 - Chapter 5 Operations
 - Chapter 6 Launch and Recovery
 - Chapter 7 MMP Firmware 4.X User Interface
- Figure 7-1: Electronics Board Configuration Error Message
 - Power Up Sequence
 - Re-Booting the System
 - Prompts and Key Combinations
 - Using the File Capture Utility
 - Powering Down the MMP
 - The Main Menu - Operating the MMP
 - <1> Set Time
 - <2> Diagnostics
 - <3> Flash Card Ops
 - <4> Sleep
 - <5> Bench Test
 - FSI CTD
 - Sea-Bird CTD
 - FSI ACM
 - MAVS ACM
- Figure 7-36: MAVS ACM Pass-Through Communications
 - Option <6> FSI ACM Tilt and Compass
 - System Evaluation
 - Option <7> Motor Operation
 - Option <8> Brake On/Off Change?
 - Option <9> Independent Watchdog
 - System Options Tests
 - Option Inductive Telemetry
 - Option 
Acoustic Transponder
 - Option 
Battery Endurance  - Option 
SIM/UIM Transactions - Option Inductive Charger Modem
 - Option 
Fluorometer  - Option 
CDOM Fluorometer  - Option 
IR Turbidity  - Option Power UIM
 - Option 
Configure  
 - <6> Deploy Profiler
 - Initialization
 - Programming a Deployment
 - MMP Deployment Definition Parameters
 - Mooring ID
 - Start Parameters
 - Schedule Parameters
 - Stops Parameters
 - Endurance Parameters
 - Deploy
 - <7> Offload Deployment Data
 - <8> Contacting McLane
 Watchdog Initialization Profiling History Exiting to the Monitor
 - Chapter 8 Data Offload, Processing, and Interpretation
- Overview
 - Reviewing Deployment Data
 - Removing the Flash Card
 - Unpacking and Translating the Binary Data Files
 - MMP Unpacker Application
 - Editing MMPUnpacker.INI
 - The PDP-N_NN Utility Program
 - Processing and Interpreting MMP Data
- Mapping Velocity Measurements
 - ACM Compass Calibration Step 1 – Map Horizontal C
 - ACM Compass Calibration Step 2 – Plot Raw Measure
 - ACM Compass Calibration Step 3 – Adjust Parameter
 - ACM Compass Calibration Step 4 – Conduct a Spin T
 - ACM Compass Calibration Step 5 – Removing the Bia
 - Mapping Velocity Measurements to the Cartesian Earth Frame
 - Sting and Acoustic Path Geometry
 - Velocity Transformation
 - Synchronizing the Data Streams
 - Data Processing Shareware
 
 
 - Appendix A Operating Crosscut for Windows and Crosscut
 - Appendix B System Architecture
 - Appendix C Bench Top Deployment
- Bench Top Deployment Example Settings
- Figure C-1: Bench top Deployment Example
 - Figure C-2: Bench top Deployment Example (continued)
 - Figure C-3: Bench top Deployment Example (continued)
 - Figure C-4: Bench top Deployment Example (continued)
 - Figure C-5:Bench top Deployment Example (continued)
 - Figure C-6: Bench top Deployment Example (continued)
 - Figure C-7: Bench top Deployment Example (continued)
 - Figure C-8: Bench top Deployment Example (continued)
 - Figure C-9: Bench top Deployment Example (continued)
 - Figure C-10: Bench top Deployment Example (continued)
 - Figure C-11: Bench top Deployment Example (continued)
 - Figure C-12: Bench top Deployment Example (continued)
 - Figure C-13: Bench top Deployment Example (continued)
 - Figure C-14: Bench top Deployment Example (continued)
 - Figure C-15 :Bench top Deployment Example (continued)
 - Figure C-16: Bench top Deployment Example (continued)
 - Figure C-17: Bench top Deployment Example (continued)
 - Figure C-18: Bench top Deployment Example (continued)
 - Figure C-19: Bench top Deployment Example (continued)
 
 - Deployment Parameter Examples
 
 - Bench Top Deployment Example Settings
 - Appendix D ACM Compass Calibration
 - Appendix E Optional Transponder
 - Appendix F Unpacking data using PDP-N_NN.EXE
 - Appendix G Rev C Electronics Board User Interface
- Power Up Sequence
 - Re-Booting the System
 - System Prompts and Key Combinations
 - Using the File Capture Utility
 - Powering Down the MMP
 - The Main Menu - Operating the MMP
 - <1> Set Time
 - <2> Diagnostics
 - <3> Flash Card Ops
 - <4> Sleep
 - <5> Bench Test
- Figure G-15: Bench Test
 - Option <1> CTD Communication
 - Verifying CTD Settings
 - Option <2> CTD Pressure
 - Option <3> CTD Average Pressure
 - Option <4> CTD Temperature Record
 - Option <5> ACM Communication
 - Option <6> ACM Tilt and Compass
 - Option <7> Motor Operation
 - Option <8> Brake Set/Off Change?
 - Option <9> Independent Watchdog
 - System Options Tests
 - Option Inductive Telemetry
 - Option 
Acoustic Transponder
 - Option <0> Offload Routines
 - Option 
Fluorometer  - Option 
IR Turbidity  - Option Power UIM
 
 - <6> Deploy Profiler
 - Programming a Deployment
 - MMP Deployment Definition Parameters
 - Mooring ID
 - Start Parameters
 - Schedule Parameters
 - Stops Parameters
 - Deploy
 - Profile and Deployment Termination Conditions
 - <7> Offload Deployment Data
 - <8> Contacting McLane
 Watchdog Initialization Profiling Odometer Exiting to the Monitor
 - Appendix H Using the MMP Deployment Planner
- Creating a Deployment Plan
 - Changing User Preferences
 - Understanding Dive Zero
- Figure H-9: Deployment Planner Project Tab
 - Figure H-10: Dive Zero - 1 Oct 2008, First Pattern 10 Oct 2008
 - Figure H-11: Dive Zero - 1 Nov 2008, First Pattern 10 Oct 2009
 - Figure H-12: Dive Zero - 20 Oct 2008, First Pattern Oct, 2008
 - Figure H-13: Schedule Display in Profiler Firmware
 - Figure H-14: Deployment Screen
 - Figure H-15: Dive Zero Changed
 
 
 - Appendix I Seapoint Analog Sensors
 - Appendix J Underwater Inductive Modem (UIM)
 - Appendix K Turbidity/Fluorometer Inductive Coil Configuration
 - Appendix L Sea-Bird CTD Sensors
 - Appendix M Aanderaa Oxygen Optode Sensor
 - Appendix N MMP w/ Battery Housing Glass Sphere Extension
- Figure N-1: MMP with Battery Housing Glass Sphere Extension
 - Figure N-2: MMP Battery Housing Glass Sphere Extension
 - Figure N-3: Removing Bottom Bolts
 - Figure N-4: Installed Support Legs
 - Figure N-5: Removing Top Cap
 - Figure N-6: Removing Horsehair Padding
 - Figure N-7: Removing “Top” Sphere
 - Figure N-8: Removing Panel Cap Screw
 - Figure N-9: Installing Nylon Studs
 - Figure N-10: Installing M3100A Extension Plate
 - Figure N-11: Installing Front Panel Extension
 - Figure N-12: Installing Spacer Legs with Studs
 - Figure N-13: Reinstalling “Top” Sphere
 - Figure N-14: Installing Spacer Legs with Studs
 - Figure N-15: Frame Plate ‘A’ Reinstalled
 - Figure N-16: Installing and Tightening Cap Screws on Front Panel
 - Figure N-17: Tightening Cap Screw on Frame Plate
 - Figure N-18: Glass Battery Housing Sphere Installed
 - Figure N-19: Routed and Connected Cable
 - Figure N-20: Installing Extension Skin
 - Figure N-21: Reinstalling Horsehair
 - Figure N-22: Reinstalling Top Cap
 - Figure N-23: End Cap – Full View
 - Figure N-24: Color-Coding on End Cap
 
 

Chapter 4 
Maintenance and Storage 
Cleaning and Inspection Procedures 
Several maintenance procedures are recommended for the MMP. Before deployment, 
after recovery, and before and after storage, inspect the following: 
•  O-rings 
•  Bulkhead and cable connectors 
•  Nylon and stainless steel hardware 
•  Glass spheres 
If you can immerse the MMP in fresh water, use warm water with soap or mild detergent 
added to remove salt and other substances. Common soaps and detergents will not damage the 
MMP. Do not use solvents. 
IMPORTANT 
Salt crystals can form on o-rings or o-ring sealing surfaces as seawater evaporates, leaving grit 
that could cause leaks during your next deployment. Thoroughly rinsing the MMP with fresh 
water immediately after recovery is a critical maintenance procedure to extend system life and 
prevent future problems. 
O-Rings 
Both ends of the controller housing are sealed with face and radial o-rings. Inspect  
o-rings for damage, wear, and foreign material before and after every deployment to prevent 
flooding of the housing. Look for small cracks and feel for bumps, grit, or hair. After inspection, 
ensure that the o-rings stay in position as the end cap is inserted into the cylinder. Spare o-rings 
are included in the Toolkit. Part numbers are given in the following table: 
Controller 
Face  2-256, BUNA-N, 70 durometer 
  Radial  2-253, BUNA-N, 70 durometer 
  Back-up  8-253, BUNA-N, 90 durometer 
  4-1 










