User manual
Table Of Contents
- Chapter 1Introduction
- Chapter 2 Mechanical Description
- Chapter 3 Electronic Description
- Chapter 4 Maintenance and Storage
- Chapter 5 Operations
- Chapter 6 Launch and Recovery
- Chapter 7 MMP Firmware 4.X User Interface
- Figure 7-1: Electronics Board Configuration Error Message
- Power Up Sequence
- Re-Booting the System
- Prompts and Key Combinations
- Using the File Capture Utility
- Powering Down the MMP
- The Main Menu - Operating the MMP
- <1> Set Time
- <2> Diagnostics
- <3> Flash Card Ops
- <4> Sleep
- <5> Bench Test
- FSI CTD
- Sea-Bird CTD
- FSI ACM
- MAVS ACM
- Figure 7-36: MAVS ACM Pass-Through Communications
- Option <6> FSI ACM Tilt and Compass
- System Evaluation
- Option <7> Motor Operation
- Option <8> Brake On/Off Change?
- Option <9> Independent Watchdog
- System Options Tests
- Option Inductive Telemetry
- Option
Acoustic Transponder
- Option
Battery Endurance - Option
SIM/UIM Transactions - Option Inductive Charger Modem
- Option
Fluorometer - Option
CDOM Fluorometer - Option
IR Turbidity - Option Power UIM
- Option
Configure
- <6> Deploy Profiler
- Initialization
- Programming a Deployment
- MMP Deployment Definition Parameters
- Mooring ID
- Start Parameters
- Schedule Parameters
- Stops Parameters
- Endurance Parameters
- Deploy
- <7> Offload Deployment Data
- <8> Contacting McLane
Watchdog Initialization Profiling History Exiting to the Monitor
- Chapter 8 Data Offload, Processing, and Interpretation
- Overview
- Reviewing Deployment Data
- Removing the Flash Card
- Unpacking and Translating the Binary Data Files
- MMP Unpacker Application
- Editing MMPUnpacker.INI
- The PDP-N_NN Utility Program
- Processing and Interpreting MMP Data
- Mapping Velocity Measurements
- ACM Compass Calibration Step 1 – Map Horizontal C
- ACM Compass Calibration Step 2 – Plot Raw Measure
- ACM Compass Calibration Step 3 – Adjust Parameter
- ACM Compass Calibration Step 4 – Conduct a Spin T
- ACM Compass Calibration Step 5 – Removing the Bia
- Mapping Velocity Measurements to the Cartesian Earth Frame
- Sting and Acoustic Path Geometry
- Velocity Transformation
- Synchronizing the Data Streams
- Data Processing Shareware
- Appendix A Operating Crosscut for Windows and Crosscut
- Appendix B System Architecture
- Appendix C Bench Top Deployment
- Bench Top Deployment Example Settings
- Figure C-1: Bench top Deployment Example
- Figure C-2: Bench top Deployment Example (continued)
- Figure C-3: Bench top Deployment Example (continued)
- Figure C-4: Bench top Deployment Example (continued)
- Figure C-5:Bench top Deployment Example (continued)
- Figure C-6: Bench top Deployment Example (continued)
- Figure C-7: Bench top Deployment Example (continued)
- Figure C-8: Bench top Deployment Example (continued)
- Figure C-9: Bench top Deployment Example (continued)
- Figure C-10: Bench top Deployment Example (continued)
- Figure C-11: Bench top Deployment Example (continued)
- Figure C-12: Bench top Deployment Example (continued)
- Figure C-13: Bench top Deployment Example (continued)
- Figure C-14: Bench top Deployment Example (continued)
- Figure C-15 :Bench top Deployment Example (continued)
- Figure C-16: Bench top Deployment Example (continued)
- Figure C-17: Bench top Deployment Example (continued)
- Figure C-18: Bench top Deployment Example (continued)
- Figure C-19: Bench top Deployment Example (continued)
- Deployment Parameter Examples
- Bench Top Deployment Example Settings
- Appendix D ACM Compass Calibration
- Appendix E Optional Transponder
- Appendix F Unpacking data using PDP-N_NN.EXE
- Appendix G Rev C Electronics Board User Interface
- Power Up Sequence
- Re-Booting the System
- System Prompts and Key Combinations
- Using the File Capture Utility
- Powering Down the MMP
- The Main Menu - Operating the MMP
- <1> Set Time
- <2> Diagnostics
- <3> Flash Card Ops
- <4> Sleep
- <5> Bench Test
- Figure G-15: Bench Test
- Option <1> CTD Communication
- Verifying CTD Settings
- Option <2> CTD Pressure
- Option <3> CTD Average Pressure
- Option <4> CTD Temperature Record
- Option <5> ACM Communication
- Option <6> ACM Tilt and Compass
- Option <7> Motor Operation
- Option <8> Brake Set/Off Change?
- Option <9> Independent Watchdog
- System Options Tests
- Option Inductive Telemetry
- Option
Acoustic Transponder
- Option <0> Offload Routines
- Option
Fluorometer - Option
IR Turbidity - Option Power UIM
- <6> Deploy Profiler
- Programming a Deployment
- MMP Deployment Definition Parameters
- Mooring ID
- Start Parameters
- Schedule Parameters
- Stops Parameters
- Deploy
- Profile and Deployment Termination Conditions
- <7> Offload Deployment Data
- <8> Contacting McLane
Watchdog Initialization Profiling Odometer Exiting to the Monitor
- Appendix H Using the MMP Deployment Planner
- Creating a Deployment Plan
- Changing User Preferences
- Understanding Dive Zero
- Figure H-9: Deployment Planner Project Tab
- Figure H-10: Dive Zero - 1 Oct 2008, First Pattern 10 Oct 2008
- Figure H-11: Dive Zero - 1 Nov 2008, First Pattern 10 Oct 2009
- Figure H-12: Dive Zero - 20 Oct 2008, First Pattern Oct, 2008
- Figure H-13: Schedule Display in Profiler Firmware
- Figure H-14: Deployment Screen
- Figure H-15: Dive Zero Changed
- Appendix I Seapoint Analog Sensors
- Appendix J Underwater Inductive Modem (UIM)
- Appendix K Turbidity/Fluorometer Inductive Coil Configuration
- Appendix L Sea-Bird CTD Sensors
- Appendix M Aanderaa Oxygen Optode Sensor
- Appendix N MMP w/ Battery Housing Glass Sphere Extension
- Figure N-1: MMP with Battery Housing Glass Sphere Extension
- Figure N-2: MMP Battery Housing Glass Sphere Extension
- Figure N-3: Removing Bottom Bolts
- Figure N-4: Installed Support Legs
- Figure N-5: Removing Top Cap
- Figure N-6: Removing Horsehair Padding
- Figure N-7: Removing “Top” Sphere
- Figure N-8: Removing Panel Cap Screw
- Figure N-9: Installing Nylon Studs
- Figure N-10: Installing M3100A Extension Plate
- Figure N-11: Installing Front Panel Extension
- Figure N-12: Installing Spacer Legs with Studs
- Figure N-13: Reinstalling “Top” Sphere
- Figure N-14: Installing Spacer Legs with Studs
- Figure N-15: Frame Plate ‘A’ Reinstalled
- Figure N-16: Installing and Tightening Cap Screws on Front Panel
- Figure N-17: Tightening Cap Screw on Frame Plate
- Figure N-18: Glass Battery Housing Sphere Installed
- Figure N-19: Routed and Connected Cable
- Figure N-20: Installing Extension Skin
- Figure N-21: Reinstalling Horsehair
- Figure N-22: Reinstalling Top Cap
- Figure N-23: End Cap – Full View
- Figure N-24: Color-Coding on End Cap

12. Use the crane to slide the profiler down the cable and into the water. When the
MMP is sufficiently immersed to avoid unnecessary snap loads, release it and
recover the crane and tag lines.
13. Continue to stream cable, attaching the lower bumper at the planned location.
Secure the end of the cable to the acoustic release and anchor.
14. Deploy the anchor when the station is reached.
Recovery Procedure
To recover the MMP, complete the following steps:
1. Trigger the release and capture one end of the mooring.
2. Detach the float and run the cable through the A-frame block and onto the winch.
When the upper bumper is reached, pull that section of cable onto the deck and
remove the bumper.
3. Continue to wind cable onto the winch. The MMP will be on the tether
somewhere between the stoppers. The exact location of the MMP depends on the
profiling schedule, ballasting accuracy, and whether the tension in the cable after
release can sustain some degree of coupling with the drive wheel. The presence
of flotation modules below the lower stopper may have a strong effect on
coupling. However, the MMP is not buoyant in air and the drive wheel, even
with strong coupling, will only sustain a few pounds.
4. Continue to wind the mooring cable onto the winch and, in the absence of severe
fouling or entanglement, the MMP must eventually fetch up against the bottom
stopper. The stopper will sustain the full flooded weight of the MMP and can be
used to lift the profiler clear of the water. If you recover the bottom of the
mooring first, the top stopper can be used to lift the MMP.
6-5