Specifications

RECEIVING INSPECTION
This machine has been thoroughly inspected before leaving our facility. This
provides the assurance that the machine produces good termination and
Is ready to use. However, the following points should be reviewed to verify that no
problems have occurred during shipment.
1. Carefully uncrate the machine and place it on a sturdy bench and
examine it against the report sent with machine.
2. Inspect the entire machine for evidence of damage that may have
occurred during transit. If in fact the machine shows signs of damage,
contact Sentinel Connector Systems, Inc. immediately.
3. Check all components to be certain they are secure. Don’t operate
machine until all loose tooling has been tightened down safely.
4. Please maintain the crate the machine has been delivered. In the event
the machine has need of repairs or lease if terminated the machine must
be sent back in its original crate. This is to maintain proper protection of
the machine from any shipping damage. Your help in this manner is
greatly appreciated.