Specifications

Changing Out the Hanging Bars
DMAN-0001 REV B 15
Figure 6. Close-up of Hanging Bracket Assembly Front View
5. Extend the integral handle bars out on each side of the hanging bar.
Two people are required for steps 6 through 9.
Load the Flexible Display into the shipping crate:
6. Grasping the handle bars, carefully lift the Flexible Display up off the floor. You
should be facing the display‟s face.
NOTE: Refer to the NanoLumens NL6 112” Flexible Display Specifications for weight
specifications.
7. Align the hanging brackets inside the 2x4 studs mounted on the shipping crate
wall.
Figure 7. Aligning Crate Brackets with Crate 2x4 Studs
1/4-20 Long Bolt
1/4-20 Flat Washers
Hanging Bracket
(wraps around bar)
Blue Bushings
3/8-16 Flat Washers
Nylon Locking Nut