Specifications
Changing Out the Hanging Bars
DMAN-0001 REV B 15
Figure 6. Close-up of Hanging Bracket Assembly Front View
5. Extend the integral handle bars out on each side of the hanging bar.
Two people are required for steps 6 through 9.
Load the Flexible Display into the shipping crate:
6. Grasping the handle bars, carefully lift the Flexible Display up off the floor. You
should be facing the display‟s face.
NOTE: Refer to the NanoLumens NL6 – 112” Flexible Display Specifications for weight
specifications.
7. Align the hanging brackets inside the 2x4 studs mounted on the shipping crate
wall.
Figure 7. Aligning Crate Brackets with Crate 2x4 Studs
1/4-20 Long Bolt
1/4-20 Flat Washers
Hanging Bracket
(wraps around bar)
Blue Bushings
3/8-16 Flat Washers
Nylon Locking Nut