Specifications
Verdi V-2/V-5/V-6 Laser Preinstallation Manual
5
6. Proceed to the paragraph titled, “Installing the Power Supply”.
The riser/heat sink clamps and chiller connection will be
installed during the final installation procedures.
Installing the
Power Supply
1. Move the power supply to an accessible-friendly location,
preferably away from heat producing sources. Ensure the
cooling intake and exhaust (rear, top, and left side) are not
blocked or obstructed.
If storing the power supply in a 19 in. (48 cm) equipment rack,
allow a minimum horizontal clearance of 17.937 in.
(45.56 cm) for the front panel of the power supply.
The system will not operate with the interlock open. For addi-
tional information on the interlock, including the connection of
an external interlock circuit, refer to the paragraph titled,
“External Interlock”.
2. Connect the interlock connector (Figure 1-1, item 6) on the
rear of the power supply.
The interlock connector may be located in the installation kit
or may be attached to the umbilical.
3. Connect the AC power cord on the rear of the power supply.
Do not connect the AC power cord at this time.
Figure 1-4. Laser Head Base – Protective Cover Removed
DOWEL PIN HOLES