Specifications

Verdi V-2/V-5/V-6 Laser Preinstallation Manual
6
Each customer must inspect the power cord and install the
proper connector if necessary. The connector should be
installed in a properly grounded outlet with a maximum of
10 Ampere service @ 110 V and 11 Ampere service @ 220 V
for proper overcurrent and earth fault protection.
4. Proceed to the paragraph titled, “Final Installation and Initial
Turn-On Procedures”.
Final Installation
and Initial
Turn-On
Procedures
After installing the laser head and power supply in accordance with
paragraphs titled, “Installing the Laser Head” and “Installing the
Power Supply”, complete the installation as follows:
1. Position the power supply and laser head in the operating posi-
tion with the umbilical as straight as possible. Ensure that the
umbilical has a bend radius of 5 inches or greater. A distance
of 6 to 24 inches is recommended between the Verdi output
and any laser being pumped.
Excessively tight umbilical bends (less than a 5 inch radius) can
cause permanent damage to the optical fiber.
2. If a water-cooled system is used, position the chiller in the
operating position. Fill and prepare the chiller in accordance
with the chiller user’s manual.
3. Cut the user-supplied cooling water lines to the appropriate
lengths and use the water line hardware (Figure 1-1, item 9) to
connect the riser/heat sink to the chiller (Figure 1-6). Apply
teflon tape to the hardware threads and install the washers from
the installation kit over the threads when connecting the stain-
less steel ferrule to the riser/heat sink. Check the system for
leaks.
4. If a passive riser/heat sink will be used, ensure the riser/heat
sink is mounted on a thermally conductive surface (such as an
optical table) that provides sufficient heat dissipation to main-
tain the laser head baseplate below 55°C, preferably below
40°C.
5. Use four riser/heat sink clamps (Figure 1-1, item 1) to secure
the system to the optical table. Tighten the two front clamps
firmly using an Allen head wrench. Tighten the two rear
clamps finger tight only.
6. Connect power supply to facility power. Ensure all packing
materials have been removed.