Specifications
Verdi V-2/V-5/V-6 Laser Preinstallation Manual
3
The laser head is shipped with a protective plastic plate installed
over the baseplate. Leave the plastic plate in place until laser head is
ready for installation.
1. Remove the packing material from the riser/heat sink
(Figure 1-2).
2. Insert two dowel pins (Figure 1-1 , item 12) into the riser/heat
sink dowel holes (Figure 1-2, item 1), ball-end up.
Avoid damage to the laser head baseplate, which is milled to a
flatness of ± 0.1 mm. This tolerance provides maximum thermal
conduction between the baseplate and the mounting surface.
Keep the umbilical as straight as possible while avoiding
rotating the laser head with respect to the power supply.
Do not apply thermal compound or any other material on the
laser head baseplate or on the riser/heat sink.
3. Remove the laser head and power supply from the shipping
crate. Place the laser head on its side and on a protected surface
to avoid scratching the cover as shown on Figure 1-3. Remove
the three screws (Figure 1-3, item 2) securing the protective
plastic cover (item 4) to the laser head baseplate. Any
scratches, damage, or contamination of the baseplate will
reduce the thermal conduction between the baseplate and the
mounting surface.
4. Refer to Figure 1-4 for the laser head dowel pin positions.
Carefully place the laser head over the riser/heat sink and onto
the dowel pins.
Do not use excessive force when clamping the Verdi to the
riser/heat sink.
5. Use four laser head clamps (Figure 1-1 item 9) to secure the
laser head to the riser/heat sink. Tighten the 4 clamps firmly
using an Allen head wrench.