Instructions

Loosen the screws at A and B in the figure, and press the
corrugated tube into the hold-down block to prevent
them from hanging down on the Hotbed.
将图示A、B两处的螺丝拧松将波纹管压在压紧块内,以便防
止线材垂于热床板上。
B
A