Installation Instructions

4
Rough Opening and Sill Preparation (cont.)
STOP – Read Following Note For Design
Pressure Rating Considerations
NOTE: If your structure has housewrap and you
must preserve design pressure ratings
DO NOT PERFORM STEP 1 BELOW.
See Page 5 for required techniques.
Step 1 can be used where design
pressure ratings are not a concern and
must
be used for brickmould non-DPR
installations.
Step 2 below must
be completed for
all DPR and non-DPR installations.
1. Apply a continuous 1/4" bead of high-quality
sealant (compatible with nailing fin, brickmould and
exterior face of wall) to the exterior face of the wall
located 1/2" from the rough opening edge.
Caulk around the head and two vertical sides of the
rough opening (FIGURE 1). When the door is
installed the caulk bead must contact the nailing
fin or brickmould continuously so it seals them
against the face of the wall.
2. Apply two parallel beads of caulk on top of
the subfloor membrane (FIGURE 2). One bead
should be 1/2" from the wall’s exterior surface. The
second bead should be 1-3/4" back from the wall’s
exterior surface. These two caulk beads should be
generous, continuous, and run the full width of the
sill.
For DPR ratings continue on Page 5.
FIGURE 1
FIGURE 2
SEALANT ON
SUBFLOOR
1-3/4"
1/2"
CAULK BEAD ON
EXTERIOR OF
ROUGH OPENING
4-Wide
All
Wd Bk Mld
Cld Nail Fin
Gen - All