Installation Instructions

7
Door Installation For Clad Nailing Fin Units (cont.)
IMPORTANT: Take diagonal
measurements across outside edges of frame.
6. Continue holding unit in place. Square and
plumb jambs. Check both side-to-side and inside-
to-outside (FIGURE 5). Measure from corner-to-
corner to check for square (FIGURES 6 & 7).
7. Use a pry bar to slide bottom of unit left or right
until diagonal measurements are exactly the same.
8. Secure other top corner and check again for
level, plumb and square.
9. Use shims and a straightedge to straighten the
side and top jamb. When straight, fasten through
the the nailing fin spacing screws as prescribed on
Page v.
NOTE: If maintaining design pressure ratings are
not a concern, roofing nails long enough
to penetrate framing material by at least
1-1/2", may be used instead of screws.
Improper use of hand and power tools could
result in personal injury and/or product damage.
Follow equipment manufacturers’ instructions for
safe operation. Always wear safety glasses.
FIGURE 5
FIGURE 6
FIGURE 7
4-Wide
All
Wd Bk Mld
Cld Nail Fin
Gen - All