Installation Instructions

26
Assemble 4-Wide Door Frame (cont.)
CORNER KEY
FILL VOID
WITH
SEALANT
PILOT HOLE
SIDE
JAMB
HEAD
JAMB
Note: High-quality, exterior, neutral-cure, clear,
silicone sealant (compatible with aluminum
extrusion) is to be used for all procedures
in the following instructions which call for
caulking or sealant.
For Clad Nailing Fin Units Only
See next page for wood brickmould units.
5. Fill void in side jamb cladding with sealant
(FIGURE 4).
6. Insert corner key into corner key slot in head
jamb (FIGURE 4).
7. Move head and side jambs so corner key is
inserted into corner key slot in side jamb.
8. Clamp or securely hold side and head jamb in
alignment.
9. Install one #8 x 2" Phillips flat head 401
stainless steel screw through a head jamb pilot
hole. Drive screw down into side jamb (FIGURE 5).
10. Now move to side jamb and install one #6 x
2-1/4" Phillips flat head 410 stainless steel screw
through side jamb extrusion (FIGURE 6).
11. Check and adjust side to head jamb alignment
and then secure head jamb to side jamb by
installing remaining two #8 x 2" Phillips flat head
401 stainless steel screws through head jamb pilot
holes (FIGURE 7).
12. Repeat Steps 5 through 11 for other head and
side jamb joint.
Improper use of hand and power tools could
result in personal injury and/or product damage.
Follow equipment manufacturers’ instructions for
safe operation. Always wear safety glasses.
FIGURE 4
FIGURE 5
FIGURE 6
FIGURE 7
4-Wide
All
Wd Bk Mld
Cld Nail Fin
Gen - All