Specifications

CRESTRON
Preparation for Use
Refer to the two hookup diagrams below. The first diagram illustrates the
connections to SmarTouch STS. The second diagram shows connections to the
CRESNET II system. Other than making the power connection last, complete the
connections in any order, regardless of whether the ST-LT is part of SmarTouch
STS or the CRESNET II system.
NOTE: Refer to the latest revision of the CRESTRON Network Modular Cable
Requirements (Doc. 5682) when making connections to the port labeled NET.
SmarTouch STS Hookup Connections for ST-LT
NOTE:
USE 2 FOOT SUPPLIED CABLE (CA15717)
OR EQUIVALENT (EXTENDED LENGTH) TO
CONNECT ST-LT TO SMARTOUCH STS.
DAISY CHAIN
TO ADDITIONAL
NETWORK DEVICES
POWER PACK
(500 mA)
(1000 mA
for STI-LT)
(ST-CP)
SMARTOUCH STS
PC
LUTRON
MUX LINK
NETWORK
CRESNET II System Hookup Connections for ST-LT
(CNRACK OR CNRACK-D
OR CNMS)
PC
LUTRON
MUX LINK
NETWORK
OPTIONAL
POWER PACK
(500 mA)
(1000 mA
for STI-LT)
DAISY CHAIN
TO ADDITIONAL
NETWORK DEVICES
CRESNET II SYSTEM
NOTE:
USE ST-CNB (SOLD SEPARATELY) TO
CONNECT ST-LT TO CRESNET II SYSTEM.
Operations Guide - Doc. 5694 Lutron Interface 9