Manual

ii;:;_O_ii!!;;;ii_iiO,iii'_i_ii_i4!i:i?,_!i!_,,ii_¸_iiiiiiiii'Ol%il;;!ii!_iO_'i_i!?_il¸¸_¸_!_!l%_,OL_ii:!!iii_iii'_i_i_i!i%!i:i_W:C_l!i
Handle air conditioner with care.
Be sure your air conditioner does not fall out of the opening
during installation or removal.
Do not block the louvers on the front panel.
Do not block the louvers on the outside of the air conditioner.
Excessive Weight Hazard
Use two or more people to move and install
air conditioner.
Failure to do so can result in back or other injury.
Place the air conditioner in the SMART-MOUNT TM tray. Check
that feet on bottom of air conditioner are resting on the 3/4"
(1.9 cm) x 2" (5 cm) wood strip at the bottom of the wall
opening and the top channel rests against the top of the wall
opening.
'%"" B
o rfi
A. SMART-MOUNT" tray
B. Feet on bottom of air conditioner resting on wood strip
2. If the feet on the bottom of the air conditioner do not rest on
the wood strip, remove the air conditioner and adjust the
SMART-MOUNT TM tray until feet rest on the wood strip.
O
vfh
- t I
3.
A. Air conditioner
B. Feet on bottom of air conditioner
C. _" (!.9 cm) x 2" (5 cm) wood strip
If top channel does not rest against the top of the wall
opening, remove air conditioner and adjust SMART-MOUNT TM
tray until top channel rests against wall.
A. Top of wall opening
B. Top channel
C. Air conditioner
15