Instruction manual
Hallett 13 & 30 Instruction Manual - Wastewater & Reuse
Released on 1-May-14 – XH115B Page 10 UV Pure Technologies Inc. © 2014
Assembling the Unit
SUPPLIED FOR
NORTH AMERICAN
MARKETS ONLY
TRANSIENT
VOLTAGE
SUPPRESSOR
FLEXIBLE TUBING
OPTIONAL BYPASS
VALVES
POWER CORD ENTRY
(LOCATION OF FUSE)
TO DISTRIBUTION
PIPING
POWER INPUT LABEL &
UNIT SERIAL NUMBER
FUSE DRAWER
VALVE CONNECTOR
5x20mm FUSE
& SPARE
POWER CORD
ENTRY
(FORCE OPEN)
MANUAL
POSITIONPOSITION
AUTOMATIC
FLOW
FLOW
CHECK VALVE)
(ACTS AS A
SOLENOID VALVE
DEVICES
FROM WATER
SOURCE
(PRESURIZED)
OPTIONAL DRAIN VALVE
FOR OPTIONAL VALVE
LEVER FOR OVERRIDE
OPTIONAL SOLENOID VALVE
(TEST VALVE MONTHLY)
SECURE CABLE
TO WALL
OPTIONAL BYPASS
PIPING & DRAIN VALVE
GROUNDED OUTLET
120VAC 50/60 OR
220-240VAC 50/60 Hz
FLEXIBLE TUBING
PLUG FOR VALVE
(DO NOT CONNECT ANY OTHER
DEVICE IN THIS RECEPTACLE)
PIPE INSULATION
(MUST BE INSTALLED)
TO
DRAIN
COPPER TUBING OR
EQUIVALENT OR HIGH
TEMP. PLASTIC SUCH AS PEX.
DO NOT USE PVC.
PURGE VALVE OPTION
Figure 1B
Step 1: Unpack the unit, being careful to remove all packaging material. Remove
the elastic band stretched around the top of the lamps in the unit. Inspect the unit
for damage particularly the quartz sleeve – See Figure 4A for disassembly.
Tighten any loose fasteners (#16 in Figure 4B)
Step 2: Connect the Stainless flexible hoses to both the top and bottom of the
Hallett. Remove the top and bottom covers of the unit to make the connection
more accessible. The hose for the top of the Hallett 30 is straight. Make sure
that the sealing washer is inside the hose end before making the connection.
Tighten securely.










