User's Manual

CrossFire HP All-Digital Transport System
User Guide
© SUNWAVE COMMUNICATIONS LIMITED 2015 56 Revision 05
6. Installation and Connections
6.1. Installation Preparation
6.1.1. Client Cooperation
To guarantee a secure installation and proper operation and maintenance of the device, please contact
SUNWAVE
for technical support and actively cooperate with SUNWAVEs engineering technicians to understand the installation
process,
structure, wiring, debugging steps and so on.
6.1.2. Site Investigation
Before installation, the installer should contact the project director to ensure that the site is suitable for installation.
Details required include information about the installation site such as whether there is an iron tower or high mast
nearby, the surrounding environmental conditions such as temperature and humidity, the power source and so on.
Installation staff should complete a site investigation with the project director before construction and conduct field
observation of the installation site and the coverage area of the device, to confirm factors such as signal intensity, signal
quality, the required coverage range, device location, antenna-feeder system and power supply system.
All devices must be installed indoors. The operating temperature range is -10
o
C+45
o
C. Indoor ventilation should
be robust and humidity should be 85%. (See the SPEC for the complete technical specifications.)
Note: Only the maintenance personnel or the users who understand the reason for access and are experienced with
restricted area access and understand the necessary preventive measures should access the installation site.
6.1.3. Installation Tools
Tools required for installation include:
electric percussion drill
screwdriver
wrench
6.2. Unpacking and Inspecting the Device
This section discusses the procedures for receiving the shipment, inspecting the packing container, unpacking and
inspecting the device.