Installation Manual

NANO POWER
20dBm Octa Band
Digital Radio
© Sunwave IM_CF_N2 v1.0.1 |
7
of
24
Contact us today:
www.sunwaveglobal.com
marketing@sunwaveglobal.com
Preparation
Unpacking and Inspection
Unpack and inspect the packages as the following procedure:
1. Open the shipping packages carefully for each unit from the protective packing sponge.
2. Ensure that all equipment and accessories have been delivered.
3. Ensure that all equipment and accessories have no damage. If there is any damage, contact your Sunwave service agent.
A2 Accessories