Installation Manual

NANO POWER
20dBm Octa Band
Digital Radio
© Sunwave IM_CF_N2 v1.0.1 |
15
of
24
Contact us today:
www.sunwaveglobal.com
marketing@sunwaveglobal.com
Connect power and ground cable to A2
Figure 12. Connect power cable at rear side
1. Connect and lock the power cable at the A2
rear side (Figure 12)
Figure 13. Connect ground cable at rear side
2.
Connect and screw the ground wire at the A2
rear side (Figure 13)