Installation Manual

MID POWER
4 x 37dBm Output
5G NR Compli
© Sunwave IM_CF_M2 v2.0.1 | 20 of 51
Contact
us
today:
www.sunwave.com
cf_support@sunwave.com
2. Mark 4 x
6.8mm drilling holes sites for the hanger to be attached to the wall.
3. Drill 4 holes at the marked sites using percussion drill and embed 4×
10 plastic expansion pipes. Note: H=70mm.
Fasten the case with 4×M6 expansion bolt.