Installation Manual

MID POWER
4 x 37dBm Output
5G NR Compli
© Sunwave IM_CF_M2 v2.0.1 | 26 of 51
Contact
us
today:
www.sunwave.com
cf_support@sunwave.com
Separation of Adjacent E2-O
For rack installation, it is highly recommended to
use a fan tray in the middle of 2 adjacent E2-O
for cooling.
Keep 2U separation of 2 E2-O if there is no fan
for cooling.
Note: It will reduce service life if E2-O is
continuously working in environment of high
temperature.
Connect Power and Ground Cable to E2-O
Connect Power Cable at Rear Side
1. Connect and lock the power cable at the rear
of the E2-O.
Connect Ground Cable at Rear Side
2. Connect and screw the ground wire at the
rear of the E2-O.