Installation Manual

MID POWER
4 x 37dBm Output
5G NR Compli
© Sunwave IM_CF_M2 v2.0.1 | 40 of 51
Contact
us
today:
www.sunwave.com
cf_support@sunwave.com
Pole Installation
1. Install the handle and Bracket I to the back of M2RU.
2. Install the bracket II and Bracket III to the pole.
3. Hang the M2RU on the mounting bracket and fasten with nuts M10.
4. Connect the ground cable and power cable.
Note: The diameter of Pole shall not be over 110mm or less than 55mm.