Crown Bermuda Installation Manual

13
13
CAUTION
• INSTALLBOILERSOTHATTHEGASIGNITIONSYSTEMCOMPONENTSAREPROTECTED
FROMWATER(DRIPPING,SPRAYING,RAIN,ETC.)DURINGAPPLIANCEOPERATIONANDSERVICE
(CIRCULATORREPLACEMENT,ETC.).
• OPERATIONOFTHISBOILERINASYSTEMHAVINGSIGNIFICANTAMOUNTSOFDISSOLVED
OXYGENCANCAUSESEVEREHEATEXCHANGERCORROSIONDAMAGE.
VIII System Piping
General Piping Notes
Figure11showsrecommendednearboilerpipingformostcommontypesofgravityreturnsteamsystems.Additional
informationonsteamsystemdesignmaybefoundinInstallation Guide for Residential Hydronic Heating Systems (Pub.
#200)publishedbytheHydronicsInstituteinBerkeleyHeightsNJ.
Oneoftheprimarypurposesofthisnearboilerpipingistoseparatetinywaterdropletsfromthesteamexitingtheboiler
sothat“dry”steamissenttothesystem.Ifthenearboilerpipingisnotcorrect,wetsteamwillenterthesystemandthe
followingproblemsmayoccur:
Shortcyclingonlowwater
BoilerorsystemFlooding
Hammering
Failuretoheatoneormoreradiators
AvoidthethreecommonpipingmistakesshowninFigure12.Thisapplieseveniftheexistingboilerhasoneofthepiping
mistakesshowninFigure12andappearstobeworking.Iftwoormoresteammainsmustbeconnectedtotheboiler,connect
aseparatetake-offforeachmainintotheheaderbetweentheriser(s)andequalizer.Alsonotethefollowingpoints:
1)Asizereductionmustbemadetoconnecttheheadertotheequalizer.Thisreductionmustbemadeintheequalizerline.
Donotmakethissizereductioninthehorizontalheader.
2)Onepipesteamsystemsrequireairventsoneachradiator,aswellasattheendofeachmain.Forthesystemtowork
properly,theseventsmustbeproperlyinstalled,sized,andbeingoodcondition.Inspectandreplaceanydefectivevents.If
therearenoventsattheendsofthemains,installthem.
3)DonotattempttomanifoldmultipleBSIswithgravityreturns.
4)Forinstallationswithcondensateorboilerfeedpumps,followthepumpmanufacturerspipinginstructions.Suchsystems
generallydonotrequireHartfordloops.
5)Donotuseacheckvalveinplaceof,orinadditionto,aHartfordlooponagravityreturnsystem.
6)Pipethellconnectionfromacleansourceofcoldwater.Whenthewatersupplyisfromawell,makesurethatastrainer
isinstalledinthewellsystem.
7)PipingwithaChiller-Iftheboilerisusedinconjunctionwithachiller,pipetheboilerinparallelwithchiller.Use
isolationvalvestopreventchilledwaterfromenteringtheboiler.