Crown Bermuda Installation Manual

29
29
XII Service and Maintenance
On a continuous basis:
1) Keeptheareaaroundtheboilerfreeandclearfromcombustiblematerials,gasoline,andotherammablevaporsand
liquids.
2) Keeptheareaaroundtheboilerandboilerroomventilationopeningsclearofobjectswhichmightobstructtheowof
combustionandventilationair.
On at least a weekly basis:
Forboilersequippedwitha#67lowwatercut-off,blowdownthelowwatercut-offfollowingtheinstructionsontheyel-
lowstickeradjacenttothelowwatercut-off.Duringthisblowdown,thelowwatercutoffshouldshutdowntheburners.Ifit
doesnotthelowwatercut-offshouldbereplacedimmediately.
On an annual basis:
1) Turnoffelectricalpowerandgassupplytotheboiler
2) Inspecttheuepassagesforsignsofblockage.Ifthereisanycarboninthecombustionchamberortheuepassages,
cleantheheatexchangerbeforeproceedingfurther.Seethecleaningprocedurebelow.
3) Removeanydebrisfoundinthecombustionchamber,beingcarefulnottodisturbcombustionchamberinsulation.
4) Removeallburners,notingthelocationofthepilotmainburner.Ifburnersshowsignsofdeterioration,theyshouldbe
replaced(somediscolorationaroundtheburnerportsisnormal).Cleantheburnersbyrstbrushingtheportswithasoft
bristlebrushandthenvacuumingoutanydebristhroughtheventuriopening.
5) Inspectthepilotassembly. Cleananydepositsfoundontheelectrodeandgroundingstrap.Theidealgapbetweenthe
electrodeandthegroundstrapis1/8”.Inspecttheporcelainforcracksorotherdeterioration.Replacepilotassemblyifdete-
riorationisfound.
6) Inspectthecombustionchamberinsulationfordeterioration.
7) Inspecttheignitioncableinsulationforcracksorotherdeterioration.Ifdeteriorationisfound,replacecable.
CAUTION
LABELALLWIRESPRIORTODISCONNECTIONWHENSERVICINGCONTROLS.WIRINGERRORS
CANCAUSEIMPROPERANDDANGEROUSOPERATION.VERIFYPROPEROPERATIONAFTER
SERVICING.
8) Reinstallburners,beingcarefultoputthepilotburnerbackinitsoriginallocation.
9) Inspectallboilerwiringforlooseconnectionsordeterioration.
10) Inspecttheventsystem:
Makesurethattheventsystemisfreeofobstructions.
Makesurethatallventsystemsupportsareintact.
Inspectjointsforsignsofcondensateoruegasleakage.
Inspectventingcomponentsforcorrosionorotherdeterioration.Replaceanydefectiveventcomponents.
11) Inspecttheboilerandsystemforleaks.
12) Inspectthelowwatercut-off:
ForHydrolevelCG400Alowwatercut-offs-Removeandinspecttheprobeforscaleandsedimentbuildup.Clean
anysedimentorscalefromtheprobewithascouringpadorsteelwool.ConsulttheHydrolevelCG400manualfor
anyadditionalmaintenanceinformation.Testthelowwatercut-offbeforeplacingtheboilerbackintoservice.