A.BeforeInstalling
1) Thoroughlyinspectthecastironheatexchangerforanyshippingdamage,i.e.cracksinthecastings,brokenlugsor
puncturesduetomishandling.
2) Donotusetheheatexchangerifthereisanydamagetoit.
3) Inspectthejointsbetweenthesectionsforopenings.Resealanyopeningswithhightemperaturesiliconesealant..
4) Keepthebaseintheshippingcartonuntilitistimetoperformtheassembly.Thiskeepsforeignmaterialfrom
contaminatingtheburnersorcreatingotherhazards.Donotusethebaseassemblyifthereareanysignsofvisible
damage.
5) Reviewalloftheinstallationrequirementsinthisinstallationmanual.
B.BaseAssemblyPreparation
1) Thecombinationbase-burner-manifoldisshippedassembledfromthefactory.(Thecombinationgasvalveis
shippedassembledandcanbefoundinthe“BaseBox”.)
2) Smearathinlayerofsiliconeinseveralplacesacrossthetopofthebasetoadherethebergasketstrip.
3) Installthebergasketstrip,whichwasshippedinthe“BaseBox”(FigureA1).
4) Placethebaseassemblyinthelocationwheretheboileristobeinstalled.RefertoSectionIIIandIVintheinstal-
lationmanualforadditionalinformationonplacement.
C.HeatExchangerandFlueCollectorInstallation
1) Positiontheheatexchangerabovethebasewiththereturnconnectionlocatedtowardthefrontoftheboilerand
thelugs,locatedoneachendoftheboiler,centeredoverthestuds,whichareoneachendofthebase(Figure
A1).Lowertheheatexchangeroverthestuds,takingcarenottodisturbthestudswhichmaypushoutiftheheat
exchangercomesincontactwiththem.Also,takecarenottodisturbtheceramicbergasket.
2) Oncetheheatexchangerhasbeenplacedonthebase,inspectthegasketforproperseal.Repairorreplacegasketif
necessary.
3) Securetheheatexchangerwith5/16”locknutswithnyloninsertsandwashersfromthehardwarebag.
4) Loosennutsontierodsuntiltheyarengertight.
5) Fibergasketstripsareusedtosealtheuecollectortotheheatexchanger(thisisthesamematerialusedbetween
theheatexchangerandbase).Installthisgasketingonthetopoftheheatexchanger(FigureA1).Afewdabsof
siliconemaybeusedtokeepthisgasketingfromshiftingwhentheuecollectorisinstalled.
6) InstalltheuecollectorasshowninFigureA1.Securewiththe1/4-20carriagebolt,nuts,andwashersprovided.
7) Carefullyinspectthejointbetweentheuecollectorandtheheatexchangertoverifythatthegasketisproperly
positioned.
8) Installtheblockedventswitchusingthe#8sheetmetalscrewprovidedasshowninFigureA1.
Appendix A: Knockdown Boiler Assembly Instructions
D.JacketInstallation
1) AttachthediverterPaneltothevestibulepanelusingtwo#10sheetmetalscrews.Installthesescrewsintheout-
sideholes.
2) Slipthisdiverter/vestibulepanelassemblybehindthedraftdiverteropeninginthedraftdiverterassembly(Figure
A2).Attachtothediverterassemblyusing#10sheetmetalscrews.
3) Attachtherightsidepaneltothebaseandvestibulepanelusingfour#10sheetmetalscrews.
4) Orienttherearjacketpanelsothatthetwonotchesareup.Sliptherearpanelundertheangeontherearofthe
sidepanelinstalledinthepreviousstepandsecurewiththree#10sheetmetalscrews.
NOTE
Beforeinstallingthejacket,makesuretopluganytappingswhicharenotgoingtobeused.Alsomakesurethatnotappings
arepluggedwhichwillbeneeded.SeeFigureA3ofthisappendix,aswellasPartsXIIIandIXoftheinstallationmanual.