Product specifications
User information Doka heavy-duty supporting system SL-1
13999759002 - 06/2008 Ü
The Formwork Experts
➤ Erect further supporting frames in the same way.
➤ Set down the overhead System beams (G) by
crane, mount them to the supporting frames, and
then detach them from the crane tackle. Provide
a safe workplace that is suitable for carrying out
this work (e.g. platforms or a platform trolley).
➤ Mount diagonal bracing. For details, see the sec-
tion headed "Tension-rod bracing".
Note:
For more information on assembly, dismantling
and the workflow, see the shop drawing / assembly
plan.
9759-242-01
9759-297-01
9759-297-01
G
9759-241-01
H