Product specifications

User information Doka heavy-duty supporting system SL-1
13999759002 - 06/2008 Ü
The Formwork Experts
Erect further supporting frames in the same way.
Set down the overhead System beams (G) by
crane, mount them to the supporting frames, and
then detach them from the crane tackle. Provide
a safe workplace that is suitable for carrying out
this work (e.g. platforms or a platform trolley).
Mount diagonal bracing. For details, see the sec-
tion headed "Tension-rod bracing".
Note:
For more information on assembly, dismantling
and the workflow, see the shop drawing / assembly
plan.
9759-242-01
9759-297-01
9759-297-01
G
9759-241-01
H