Owner`s manual

TM gmn-ator controls
turn
the
generator
on
and
ofT.
The
BLOWERS
switch
operates
the
bilge blowers. Flip
the
switch
up
to
operate
the
bilge
blowers. Before
attempting
to
start
the
generator,
the
bilge
area
must be
purged
of
all fumes.
Operate
the
blowers
for
at least 4 minutes.
The
STOP
switch
interrupts
current
to
the
generator
.
Turn
the
START
switch
on
to
star
t
the
generator
. Release
the
START switch
when
the
GENERATOR RUNNING indicator lights.
The
ON
/ PREHEAT switch
is
used only
on
diesel
generators
.
OPERATION
OF
AC
SYSTEMS
Read
through
the table below
to
familiarize yourself with the AC systems
on
your boat.
AC
Swi«h
DOCKSIDE I
Function
A
CAlmON
Do
not
tum
on
tJu
~
for
shore
P""'"
if
tIu
revene
poi<lrity indicnlm"
ligha
up. Disconned the
cable
and
ha""
tJu
fault
aJrTeCted
by
a quaIifird
ekctrician.
""'hen you
are
running
dockside power to
the
dockside I power
hookup,
move the
slide protector
O\'er
the GE!'\ERATOR breaker
on
the
AC
Power
Control
panel. Flip
the DOCKSIDE I breaker
(0
the
'on"
position to send
current
to
(he AC POWER
NO
. I
and
AC POWER NO. 2 panels. When this switch
is
in
the
"orr
position, the
flow
of
current
to
the panels
is
interrupted. When dockside 1 current
is
pr
esent, the
DOCKSIDE 1 POWER
indicator
will
illuminate.
A
WARNING
Some marinas
have
bem
knoun to "?nm,k" shore
power
ground circuits
to
prevent ekctrolysis.
opening
the ground circuit creak> a potentially dang""'us
00-
board shock ha=nrd. Ensure
that
your
shore power
roble ground circuit
is
always rontinuous.
Comucting
Shore pOwa' cabk:
1. Make sure the
",.aka
JOT
load group
~ng
ronructed is
in
tM
'ofr
position.
2.
umneel
short
POW<'T
cabu
at
the
boat
reuptack
and
then
at
the
shure
reuptacu
.
3. When disconnect
ing
shart power
cabk
turn
the
"'eaka
Jm-load group
~ng
disconntcted
to
tM
'ofT
position.
4.
DjJ
conn
~Cl
shUTt
pOwn'
cablr from
flu
shou
r~aplack,
and
tkn
from
the
boar receptacle.
4-9
Downloaded from CruisersOwnersForum
http://www.CruisersOwnersForum.com