Service manual
7. Remove the
J 5239
from the connecting rod bolts.
Notice:
Refer to
Fastener Notice
in Cautions and
Notices.
8. Install the connecting rod bearing, cap, and nuts.
Tighten
8.1. Tighten the nuts on the first pass evenly to
27 N·m (20 lb ft).
8.2. Tighten the nuts on the final pass to
55 degrees using the
J 36660-A
.
9. Once the piston and connecting rod assemblies
have been installed, lightly tap each connecting
rod assembly, parallel to the crankpin, in order to
make sure that the connecting rods have the
proper side clearance.
10. Use a feeler gage or a dial indicator to measure
the side clearance between the connecting rod
caps. The connecting rod side clearance
measurement should be 0.15–0.68 mm (0.006–
0.027 in).
31373
480549
5163
Engine Engine Mechanical - 5.0L and 5.7L 6-113
2002 - Unit Repair (May 25, 2001)