GaugeCalHP Rebuild d Kit Kit Instructions Instructions
— — Required Tools Allen Keys 5/64" 3/32" 3/16" 1/4" 9/16" Phillips-head Screwdriver Drill Rod (or similar tool) Ø = 0.128"– 0.
— — GaugeCalHP Rebuild Kit Instructions 1 Main Components and Assemblies 1 Remove all gauges from the comparator. 2 From the underside of the comparator, use a 5/64" Allen key to loosen the two Set Screws securing the Reservoir Assembly to the Shroud. 3 From the topside of the comparator, twist the Reservoir Assembly clockwise, and then lift to remove it from the Shroud. Rebuild the Reservoir Assembly using the procedure on page 7.
2 GaugeCalHP Rebuild Kit Instructions 6 Lift the Drip Tray to remove it from the Manifold Assembly. 7 Remove the Manifold Nut and Wave Spring from the Manifold Fitting. 8 Lift the Manifold Assembly to remove it from the Manifold Fitting. Rebuild the Manifold Assembly using the procedure on page 5. 9 Remove the Manifold Fitting from the Manifold Base. 10 Replace the O-ring (P N 5139).
GaugeCalHP Rebuild Kit Instructions 3 11 Using a 5/64" Allen key, loosen the Set Screw and remove the Fine Adjust Knob. 12 From the underside of the comparator, use a 9/16" Allen key to remove the four Socket Head Screws PN 5139 securing the Fine Adjust Assembly to the Manifold Base. 13 Remove the Fine Adjust Assembly and replace the O-ring (P N 5139). Rebuild the Fine Adjust Assembly using the procedure on page 6.
4 GaugeCalHP Rebuild Kit Instructions 15 Using a 5/64" Allen key, remove the four Screws from the two sides of the comparator Shroud. 16 Slide the Shroud to the rear of the comparator to remove it. For steps 14-18, it is recommended that the rear assemblies be secured in a vise (or similar fashion) as some force may be required to remove the Piston Assembly and Struts. 17 Using a 1/4" Allen key, remove the four Socket Head Screws near the Handle Hub.
GaugeCalHP Rebuild Kit Instructions 5 22 Remove the Gland Assembly from the four threaded Studs. Rebuild the Gland Assembly using the procedure on page 8. 23 Once the required maintenance has been performed on all assemblies, reassemble the comparator by following steps 1-22 in reverse order. — — Manifold Assembly 1 From the underside of the Manifold, use a 3/32" Allen key to remove the Retainers securing the two outside Fittings.
6 GaugeCalHP Rebuild Kit Instructions — — Fine Adjust Assembly 1 Remove the Piston and Retainer Subassembly from the Cylinder. 2 Using a drill rod or other appropriPN 5140 ate tool, push the seal (P N 5140) out through the top of the cylinder. The tool should have an outside diameter of 0.128"– 0.135". 3 Carefully and slowly, work the new Seal (P N 5140) down the threads of the Cylinder.
— — GaugeCalHP Rebuild Kit Instructions 7 Reservoir Assembly 1 From the underside of the Reservoir, remove the Fitting from the Reservoir Base. 2 Remove the Reservoir Fitting and replace the two O-rings (P N 5139) and (P N 5141). PN 5139 PN 5141 3 From the topside of the Reservoir, remove the Reservoir Knob. 4 Using a Phillips-head screwdriver, PN 5145 remove the two Reservoir Cap PN 5129 Sealing Screws (P N 5145), and then remove the Reservoir Cap.
— — 8 GaugeCalHP Rebuild Kit Instructions Gland Assembly 1 From the rear of the Gland Housing, PN 5133 remove the O-ring (P N 5137), Main Seal (P N 5136), Main Seal Backup PN 5134 Ring (P N 5159), Inner O-ring (P N PN 5159 PN 5136 5134), and Backup Ring (P N 5133). PN 5137 Rear Gland Housing PN 5132 PN 5136 PN 5131 PN 5137 2 From the front of the Gland Housing, inspect the inside diameter of the Bearing to confirm that it is still within specification: 0.501-0.505" (12.7-12.
— — GaugeCalHP Rebuild Kit Parts List PN 5120 Dowel PN 5176 Strut Tool PN 5145 (2x) Sealing Screw PN 5159 Backup Ring PN 5140 Fine Adjust Seal PN 5142 (2x) O-ring PN 5139 (3x) O-Ring PN 5138 (6x) O-ring PN 5129 Reservoir Seal PN 5134 O-Ring PN 5141 O-ring PN 5137 O-ring PN 5133 Backup Ring PN 5136 Gland Seal
© 2013 Crystal Engineering Corporation 708 Fiero Lane, Suite 9, San Luis Obispo, California 93401-8701 5200.