User Manual
2 Click the Setup Wizard button.
3 Install your Red and Black test leads into the Switch Test locations
as sho
wn in the wizard. Ensure that the leads are not connected
together forming a closed circuit.
4 Press Start. The application will survey the circuit in the open state.
5 When prompted by “Waiting for switch to close…,” connect the red
and black t
est leads together creating a closed circuit.
The application will survey the circuit in the closed state.
6 Select Finished.
7 Update your Gauge by selecting the Update Gauge button.
Your nVision with MA20 is fully functional and ready to use.