nVision Operation Manual
5 Install a new module in the same orientation as the one removed in step 4. The tri-lobe design of the module will not allow improper installation; do not
force installation of the module as permanent damage may occur. To ensure an IP67 rated seal, lightly lubricate the modules o-ring (P/N: 4110) with Dow
111 silicon lubricant or equivalent.
(4x)
Lightly lubricate the o-ring, then install the module in the proper orientation.
Note: If installing a Blank Plate, conrm orientation is at and even within the module bay for proper sealing.
6 Tighten face plate T10 Torx screws to 50 in-oz (0.35 newton meter (N-m)) torque.
7
Replace power module/plug and tighten to 50 in-oz (0.35 newton meter (N-m)) torque to ensure IP67 seal. When power is rst applied the unit will automatically
turn on. Ensure that nVision recognizes the new module by conrming in CrystalControl or the Summary screens.
8 Before using the nVision to record, Erase All Data. See Recording in the Chassis chapter.
9 If you have any problems during this process, check the Troubleshooting section for relevant information or contact us at
crystal@ametek.com or (805) 595-5477.