Installation Sheet

You will need 12 Candelabra Base Bulb
40 Watts Recommended 60 Watts Max.
USE LED BULBS FOR EXTENDED USE
How to Install
Do a complete inventory of all parts and components
before you start installing.
Assemble one end of chain to fixture loop by opening
quick link.
Fasten mounting hardware to junction box with
machine screws.
After wires are connected,turn screw collar loop onto
nipple,then place canopy up against ceiling and
lock by screw collar loop ring.
After safely attaching fixture into junction box ,install
bulbs and proceed to connecting the power.
When you begin to dress the fixture, start with package
labeled(A).
1.
2.
3.
4.
1
[
5
3
8
"]
[
7
8
"]
A=
A
B
B=
C
C=
D=
D
G
E
F
H
I
J
K
L
E=
F=
G=
H=
I=
J=
K=
L=
M=
M
A
C
E
F
G
H
I
J
K
L
M
N
O
N=
O=
[32
1
2
"]
1054 [41
1
2
"]
1# tier
2# tier
Reference for how to dress
crystal on the top distributor box
Note: Hang crystal strand "A"and
"C"alternating on the #1 tier
#ARC-1909-GA-CL-MWP
5.
IMPORTANT:App
ly crystal sets in a
lphabetical orde
r.
Crystal
Sets
A.
4sets
27*14m
m
B.
4sets
25*14m
m
C.
8sets
44*14m
m
D.
8sets
21*14m
m
E.
1set
25*14m
m+1*76mm
drop
F.
1set
26*14m
m+1*76mm
drop
G.
1set
27*14m
m+1*7
6mm drop
H.
1set
28*14m
m+1*76mm
drop
I.
1set
29*14m
m+1*7
6mm drop
J.
1set
30*14m
m+1*76mm
drop
K.
1se
t
31*
14mm
+1*
76mm drop
L.
1set
32*
14mm+1*76mm
dr
op
M.
1se
t
33*14mm
+1*76
mm
dr
op
N.
1
2
se
ts
2*1
4mm
O.
1
2
se
ts
2*14mm
+1*7
6mm dro
p

Summary of content (2 pages)