User`s guide
120  Guardall Director V4.74 User's Guide  21-0381E v4.7.4 
Pick-List (bottom of the form) 
- Schedule (bottom of form): This is 
where you select a schedule to view 
or edit. This area shows a reference 
number assigned by the system, and 
the name of the selected schedule, 
once defined; 
Top of the Form 
- Name: A suitable name/description for 
the schedule, or its intended use; 
 Intervals  
- Days of the Week (with Associated 
Time-Intervals): The days of the week 
showing the time intervals for each day. (To 
add an interval, right-click the specific day. To 
adjust an interval, drag the interval and/or its 
end-points to the desired position.) 
Tips: You can copy and paste (or delete) time 
intervals using the right-click menu. Up to 6 unique 
time-intervals can be used as desired throughout the 
weekdays in each schedule. 
Split Shift
: Be sure to include an interval for after a 
meal break—assuming the break is not part of the 
'required attendance' times. 
Work Shift that Spans Midnight
: It's simplest to use grid 
view, entering the start and stop times in the order they 
occur (e.g., Start time: 23:00, Stop time: 07:00), and 
select the weekdays pertaining to the start
 time. 
 Holiday Schedules  
- Start of Holiday: This allows selecting 
whether holiday operation will begin at 
midnight, or not until this schedule expires 
(i.e., for time-intervals that span midnight). 
- Schedule on Type 1/2/3 Holidays: How the 
schedule will treat each type of holiday (No 
access / as regular weekday / 24 hr access, 
or as per the times in another schedule). 
Tip: Pause the mouse cursor over a Schedule in the 
list to view the associated times. 
For details on setting up holidays, refer to "Holidays 
and Time-Change Dates). 
Note: For schedules assigned only
 within other 
schedules (for use on holidays), this setting will be 
ignored. 
Grid View 
Schedules (Forms View) 










