Technical data

21 CTC EcoHeat 400
General Information
!
Tip: You should start with Economic
mode and if you find that you are not
getting enough hot water, increase
to Normal etc.
!
Tip: Set the time approx. 1 hour earlier
than you need the hot water as it
take some time to heat up the water.
5.3 DHW
You use this to set the DHW comfort level you want and
extra DHW.
Temperature
You set the values for this option which apply to the heat
pump's normal operation. There are three modes:
Economic - If you have a small DHW requirement.
Normal - Normal DHW requirement.
Comfort - Large DHW requirement.
Extra DHW (On/Off)
You select this option if you want to activate the Extra
DHW function. When this function is activated, the heat
pump starts producing extra hot water immediately. You
also have the option to schedule DHW production for
certain times using the Weekly program function, which is
recommended.
The example above shows that Extra DHW is set to On for 3.5
hours.
5.3.1 Weekly program DHW
You can use this menu to schedule periods during
weekdays when you want extra hot water. This schedule is
repeated every week. The screen shows the factory values,
which can be changed. If you want an additional period
some day, e.g. in the evening, you can program recurring
times.
The options are Off or Day by day.
Off - No scheduled DHW production.
Day by day - A weekly schedule which you program
yourself. This is used if you always know when you
repeatedly need extra hot water, for instance, during the
morning and evening.
On Monday morning at 6 am the system starts producing more
hot water until 9 am when the temperature returns to normal
again. There is a further increase between 6 pm and 9 pm.
Svenska Nederlands English Deutsch
Suomi Française Dansk Norsk
12
ºC
21,5
ºC
22,3
ºC
42
ºC
34
ºC
-1
ºC
2
ºC
1 2
1 2
22,2 ºC 21,2 ºC 58 ºC -5 ºC
1 2
1 2
1 2
06 - 09 18 - 21
07 - 09 20 - 23
06 - 09 10 - 21
06 - -- -- - 21
06 - -- -- - 21
10 - 12 20 - 23
10 - 12 20 - 23
1 2
1 2
T ºC
60
40
20
0
-20
16 20 0 4 8 12
06-09 18-21
07-09 00-00
06-09 00-00
06-09 00-00
06-09 00-00
10-12 00-00
10-12 00-00
Room temp. DHW Operation Installer
CTC EcoHeat Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Weekly program Day by day
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW
Operation data system
Status HP upper tank
Tank upper°C 49 (60)
Tank lower°C 42 (45)
Primary flow°C 42 (43)
Return flow°C 34
Radiator pump On
Mixing valve Open
Delay mixing valve 180
Electric power kW 0.0 0.0 0.0
Current L1/L2/L3 0.0 0.0 0.0
Operation data EcoHeat
Stored oper data
Compressor
Heating circuit 2
Operation data heating
Installer
Time/Language Settings Define system Service
Software display PCB: 20120205
Software HP PCB: 20120125
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control NR
Communication
Save settings
Load settings
Load factory settings
Max primary flow°C 55
Min primary flow°C Off
Heating off, out°C 18
Heating off, time 120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C -2
or
Primary flow reduced°C -3
Anti Water Hammer Yes
HP max DHW Yes
Define system
Def radiator system
Heating circuit 1
Heating circuit 2
Heat pump
Room sensor Yes
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit
Heat pump
Valves
Electric heater
Total operation time h: 14196
Max primary flow°C: 51
Consumtion kWh 20
Compressor:
Operation time /24 h:m 00:00
Stored oper data
Compressor
Compressor On
Charge pump On 47%
Brine pump On
HP in/out°C 35.5 / 42.3
Current L1 4.0
Night reduction heat circ.
Weekly program Day by day NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Night reduction heat circ.
Weekly program Block NR
Decrease Sunday 22:00
Increase Friday 14:00
Decrease -------- 00:00
Increase -------- 00:00
Holiday
Holiday period 3 days
Out Room1 Prim1 Return Room2 Prim2
Svenska Nederlands English Deutsch
Suomi Française Dansk Norsk
12
ºC
21,5
ºC
22,3
ºC
42
ºC
34
ºC
-1
ºC
2
ºC
1 2
1 2
22,2 ºC 21,2 ºC 58 ºC -5 ºC
1 2
1 2
1 2
06 - 09 18 - 21
07 - 09 20 - 23
06 - 09 10 - 21
06 - -- -- - 21
06 - -- -- - 21
10 - 12 20 - 23
10 - 12 20 - 23
1 2
1 2
T ºC
60
40
20
0
-20
16 20 0 4 8 12
06-09 18-21
07-09 00-00
06-09 00-00
06-09 00-00
06-09 00-00
10-12 00-00
10-12 00-00
Room temp. DHW Operation Installer
CTC EcoHeat Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Weekly program Day by day
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW
Operation data system
Status HP upper tank
Tank upper°C 49 (60)
Tank lower°C 42 (45)
Primary flow°C 42 (43)
Return flow°C 34
Radiator pump On
Mixing valve Open
Delay mixing valve 180
Electric power kW 0.0 0.0 0.0
Current L1/L2/L3 0.0 0.0 0.0
Operation data EcoHeat
Stored oper data
Compressor
Heating circuit 2
Operation data heating
Installer
Time/Language Settings Define system Service
Software display PCB: 20120205
Software HP PCB: 20120125
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control NR
Communication
Save settings
Load settings
Load factory settings
Max primary flow°C 55
Min primary flow°C Off
Heating off, out°C 18
Heating off, time 120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C -2
or
Primary flow reduced°C -3
Anti Water Hammer Yes
HP max DHW Yes
Define system
Def radiator system
Heating circuit 1
Heating circuit 2
Heat pump
Room sensor Yes
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit
Heat pump
Valves
Electric heater
Total operation time h: 14196
Max primary flow°C: 51
Consumtion kWh 20
Compressor:
Operation time /24 h:m 00:00
Stored oper data
Compressor
Compressor On
Charge pump On 47%
Brine pump On
HP in/out°C 35.5 / 42.3
Current L1 4.0
Night reduction heat circ.
Weekly program Day by day NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Night reduction heat circ.
Weekly program Block NR
Decrease Sunday 22:00
Increase Friday 14:00
Decrease -------- 00:00
Increase -------- 00:00
Holiday
Holiday period 3 days
Out Room1 Prim1 Return Room2 Prim2
Svenska Nederlands English Deutsch
Suomi Française Dansk Norsk
12
ºC
21,5
ºC
22,3
ºC
42
ºC
34
ºC
-1
ºC
2
ºC
1 2
1 2
22,2 ºC 21,2 ºC 58 ºC -5 ºC
1 2
1 2
1 2
06 - 09 18 - 21
07 - 09 20 - 23
06 - 09 10 - 21
06 - -- -- - 21
06 - -- -- - 21
10 - 12 20 - 23
10 - 12 20 - 23
1 2
1 2
T ºC
60
40
20
0
-20
16 20 0 4 8 12
06-09 18-21
07-09 00-00
06-09 00-00
06-09 00-00
06-09 00-00
10-12 00-00
10-12 00-00
Room temp. DHW Operation Installer
CTC EcoHeat Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Weekly program Day by day
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW
Operation data system
Status HP upper tank
Tank upper°C 49 (60)
Tank lower°C 42 (45)
Primary flow°C 42 (43)
Return flow°C 34
Radiator pump On
Mixing valve Open
Delay mixing valve 180
Electric power kW 0.0 0.0 0.0
Current L1/L2/L3 0.0 0.0 0.0
Operation data EcoHeat
Stored oper data
Compressor
Heating circuit 2
Operation data heating
Installer
Time/Language Settings Define system Service
Software display PCB: 20120205
Software HP PCB: 20120125
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control NR
Communication
Save settings
Load settings
Load factory settings
Max primary flow°C 55
Min primary flow°C Off
Heating off, out°C 18
Heating off, time 120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C -2
or
Primary flow reduced°C -3
Anti Water Hammer Yes
HP max DHW Yes
Define system
Def radiator system
Heating circuit 1
Heating circuit 2
Heat pump
Room sensor Yes
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit
Heat pump
Valves
Electric heater
Total operation time h: 14196
Max primary flow°C: 51
Consumtion kWh 20
Compressor:
Operation time /24 h:m 00:00
Stored oper data
Compressor
Compressor On
Charge pump On 47%
Brine pump On
HP in/out°C 35.5 / 42.3
Current L1 4.0
Night reduction heat circ.
Weekly program Day by day NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Night reduction heat circ.
Weekly program Block NR
Decrease Sunday 22:00
Increase Friday 14:00
Decrease -------- 00:00
Increase -------- 00:00
Holiday
Holiday period 3 days
Out Room1 Prim1 Return Room2 Prim2
3.5