Product Manual

8•EN
1. Solar panel
INSTALLATION EXAMPLES
PREREQUISITES
Solar panel capable of charging a 40–300Ah
service battery. The D250SE uses MPPT
(Maximum Power Point Tracker) to maximise the
power from a solar panel.
TIP 1
Do not connect two solar panels in series.
Max. input voltage 23V.
PREREQUISITES
A dual battery system where the D250SE
charges a 40–300Ah service battery from a
generator which also charges a starter battery.
It is advantageous to use this installation when:
• The alternator is unable to deliver the desired
charging voltage.
TIP 2
If the alternator has external voltage detection
for the service battery, the voltage detection
wiring must be connected to the starter battery.
TIP 3
Complement the D250SE with a
SMARTPASS 120S if the service battery
capacity is greater than 100Ah or has parallel
consumption while charging is in progress. This
reduces the charging time.
2. Small service battery
SERVICE
BATTERY
*
*
*
STARTER
BATTERY
SERVICE
BATTERY
*See ”CABLE AND FUSE REQUIREMENTS”
*See ”CABLE AND FUSE REQUIREMENTS”