Product Manual

EN•11
EN
D250SE CHARGING PROGRAM LEAD-ACID
STEP 1 DESULPHATION
Detects sulphated batteries. Pulsing current and voltage, removes sulphate from the lead plates
of the battery restoring the battery capacity.
STEP 2 BULK
Charging with maximum current until approximately 80% battery capacity.
STEP 3 ABSORPTION
Charging with declining current to maximize up to 100% battery capacity.
STEP 4 FLOAT
Maintaining the battery voltage at maximum level by providing a constant voltage charge.
STEP 5 PULSE
Maintaining the battery at 95–100% capacity. The charger monitors the battery voltage and
gives a pulse when necessary to keep the battery fully charged.
1
PULSE
DESULPHATION BULK ABSORPTION
1 2 3
FLOAT
54
VOLTAGE (V)CURRENT (A)
Increasing voltage to
14.4V. 20A
Declining current
14.4V
13.6V
Max 20A
12.6V‒14.4V
1.4A
15.8V
Increasing voltage to
14.7V. 20A
Declining current
14.7V
13.6V
Max 20A
12.6V‒14.7V
1.4A
15.8V
AGM
Time limit: 8h 12h 2h4h