Specifications

Installation 21
Eductor Nozzle Replacement:
Remove the three screws on the eductor cap and remove the cap.
Remove the eductor assembly.
Remove the eductor screen from the assembly
Remove the blue nozzle and replace it with the beige nozzle. Make sure to put the o-ring on the beige nozzle.
Reverse the procedure to reassemble. To prevent leaks, ensure that the gasket is in the proper position.
Backwash Flow Control Replacement:
Remove the drain clip and pull the drain elbow straight off.
Remove the backwash ow control located behind the elbow.
Reverse the procedure to reassemble.
Plumbing Connections
General Instructions
Follow local plumbing & electrical codes. Failure to do so may result in your having to redo the installation at your expense.
Take the time to make a clean, professional looking installation. Use ux and solder sparingly when making sweat
connections, and avoid excessive use of pipe compound. When using galvanized pipe, clean out excess cutting oil and metal
chips before assembly. Foreign objects, if allowed to enter the control valve, can cause operating problems.
The main water supply line may then be reopened so that hard water will be available to the household throughout the
remainder of the installation process. Set the Cul-Flo-Valve Bypass in the bypass position by screwing the stem all the way in
against the body.
Bypass Connections
Shipped with each softener is a Culligan bypass valve, which is used to connect the softener to the plumbing system. The bypass
allows the softener to be isolated from the water service line if service is necessary while still providing water to the home. The
bypass valve can be directly plumbed into the system, or can be connected with the following optional sweat connection kits.
3/4” Medallist Control Medallist Plus
PN Description PN Description
P1019783 3/4” Sweat Copper Adapter Kit 01010783 1” Sweat Copper Adapter Kit
P1019782 3/4” Elbow Sweat Copper Adapter Kit 01016564 3/4” Sweat Copper Adapter Kit
01016565 3/4” Elbow Sweat Copper Adapter Kit
For installations in Massachusetts, Massachusetts Plumbing Code 248 CMR shall be adhered to. Consult your licensed
plumber for installation of this system. This system and it’s installation must comply with state and local regulations.
Note: The number on the flow control should face into the valve body.
Caution! Close the inlet supply line and relieve system pressure before cutting into the plumbing! Flooding could result
if not done!
Caution! Close the inlet supply line and relieve system pressure before cutting into the plumbing! Flooding could result
if not done!
Caution! When making sweat connections, remove all plastic and rubber components which contact brass or copper.
Damage to these components may result otherwise.