4. Operation - PowerCommand 1.1 2-2016
50 A045R242 (Issue 7)Copyright © 2016 Cummins Inc.
FIGURE 18. BUILDING LOAD TRANSFER IN PROCESS
6. The transfer switch switches the generator set power to the building load. The
building is now running on generator power.
FIGURE 19. GENERATOR SET POWERING BUILDING LOAD
7. When the utility power is back and providing voltage to the transfer switch, the
transfer switch waits for utility power stability.
FIGURE 20. TIME REMAINING UNTIL RE-TRANSFER
8. When the utility power is stable for 5 minutes, the transfer switch switches back
to utility power.
FIGURE 21. BUILDING LOAD TRANSFER IN PROCESS