Product Manual

Table Of Contents
4. Operation - PowerCommand 1.12-2016
53A045R242 (Issue 7) Copyright © 2016 Cummins Inc.
FIGURE 26. BUILDING LOAD TRANSFER IN PROCESS
5. The transfer switch switches the generator set power to the building load. The
building is now running on generator power.
FIGURE 27. GENERATOR SET POWERING BUILDING LOAD
6. Press the Off button to switch the load back to the utility power.
FIGURE 28. BUILDING LOAD TRANSFER IN PROCESS
FIGURE 29. UTILITY POWERING BUILDING LOAD
7. Normal operation resumes.