Install Manual
Table Of Contents
- Table of Contents
- 1. Important Safety Instructions
- 1.1 Warning, Caution, and Note Styles Used in This Manual
- 1.2 General Information
- 1.3 General Precautions
- 1.4 Generator Set Voltage Is Deadly
- 1.5 Engine Exhaust Is Deadly
- 1.6 Fuel and Fumes Are Flammable
- 1.7 Batteries Can Explode
- 1.8 Vented Batteries
- 1.9 Moving Parts Can Cause Severe Personal Injury or Death
- 1.10 The Hazards of Carbon Monoxide
- 2. Introduction
- 3. Pre-Installation Considerations
- 4. Installation
- 5. Startup and Configuration
- Appendix A. Fuel Line Selection
- Appendix B. Outline and System Drawings
- Appendix C. Wiring Diagrams
- Appendix D. Seismic Requirements
5. Startup and Configuration3-2016
51A051X873 (Issue 5) Copyright © 2016 Cummins Inc.
• Press Save to save any changes. After saving, the Save button changes to the
Adjust button.
FIGURE 17. EXERCISE DURATION NAVIGATION
5.2 Time Setup
NOTICE
When battery power is lost, these settings must be reset.
NOTICE
Not applicable without a single phase RA series transfer switch.
To set up the generator set clock for the current date and time:
1. From any Information Menu, hold down the up and down arrows simultaneously
for two seconds. The Service Menu appears.
2. Access the Time Setup screen by selecting Clock Exerciser on the Genset
Service Menu.
3. Select Adjust.
When updating these settings, the functions of the keys are as follows:
• The horizontal right arrow key is used to select successive blocks for editing
settings on the screen.
• Select the left arrow to return to the previous screen.
• Adjust values by using the + or - keys on the Adjust Menu of the Time Setup
screen.