Installation Guide

3. Step-By-Step Outline of Installation 1-2014
Callout Component
Number
1 Electrical Stub-up Area Through Plastic Skid
2 Manual/Stop/Remote Switch
3 Installer Access
4 Removable Service Panel
5 Battery Location
FIGURE 5. STUBUP OPENING
3.7.1 AC Power Supply Connections
WARNING
Electrical connections must be made by a licensed electrician. Improper installation can
lead to electrocution and damage to property.
WARNING
Automatic startup of the generator set during installation can cause severe personal
injury or death. Push the control switch OFF and disconnect the negative (-) cable from
the battery to keep the generator set from starting.
18 A029V088 (Issue 16)