Product Manual

19A055H194 (Issue 3) Copyright © 2017 Cummins Inc.
3 Pre-Installation Considerations
3.1 Pre-Installation Considerations Introduction
Before installation begins, certain items must be considered. Prior coordination
reduces delays and the amount of time power has to be interrupted.
No. Description No. Description
1 Generator Set 3 Transfer Switch
2 Electrical Meter
FIGURE 1. SITE PREPARATION EXAMPLE
Areas of consideration:
Location of the generator set - this is one of the first decisions to be made, as it
affects all other aspects of the installation, such as:
Length of electric wiring
Length of fuel lines
Site preparation:
Access to the site