Service Manual
ECM Cooling Plate, Fuel Cooled ISB, ISBe and QSB (Common Rail [...]
Page 6-14 Section 6 - Injectors and Fuel Lines - Group 06
To buy Cummins Parts and Service Manuals, Training Guides, or Tools go to our website at https://store.cummins.com
Finishing Steps
Install the ECM and cooling plate to the engine as an
assembly. Refer to Procedure 019-031 in the ISB (4
cylinder) and ISB
e
(4 and 6 cylinder) Controls
Troubleshooting and Repair Manual Bulletin 3666477.
Connect the fuel lines to the inlet and outlet of the ECM
cooling plate.
WARNING
Batteries can emit explosive gases. To reduce the
possibility of personal injury, always ventilate the
compartment before servicing the batteries. To
reduce the possibility of arcing, remove the negative
(-) battery cable first and attach the negative (-)
battery cable last.
Connect the batteries.
Install the ECM to the cooling plate. Refer to Procedure
Procedure 019-031 in the CM850 Electronic Control
System, ISB Engine Troubleshooting and Repair Manual
Bulletin 4021377.
Connect the fuel lines to the inlet and outlet of the ECM
cooling plate.
WARNING
Batteries can emit explosive gases. To reduce the
possibility of personal injury, always ventilate the
compartment before servicing the batteries. To
reduce the possibility of arcing, remove the negative
(-) battery cable first and attach the negative (-)
battery cable last.
Connect the batteries.