Owners manual

INSTALLATION WALKTHROUGH:
For more information log onto www.curtmfg.com, & for helpful towing tips log onto www.hitchinfo.com
4) Fishwire the 1/2" hardware through the access hole into
position on both sides, as shown below. Reinstall heat
shield with (3) of the fasteners, without using the fastener
between the hitch mounting holes.
5) Raise hitch into position and loosely install1/2" hex flange
nuts. Note: The heat shield will be between the hitch and
vehicle frame rails.
6) Torque all 1/2" fasteners to 110 lb-ft.
7) Reinstall the exhaust and underbody panels onto
the vehicle.
DO NOT RE-INSTALL BOLT IN THIS HOLE
3) Remove (8) rubber plugs from frame (1 large and 3 small,
from each frame rail). Enlarge the access hole on both
sides to allow the 1/2" fasteners to pass into the frame rail.