Operation Manual
Table Of Contents
CyberLink PowerBackup 2
24
Using the Scheduler
Use the Scheduler to schedule backup jobs to run at a future time and
date. You can select to run jobs at a regular interval or to run once
only. Scheduled backups run in the background, without interrupting
your work.
Note: This feature is only available in the full retail version of
PowerBackup.
Click or use the View > Scheduler command to open the
Scheduler function. The large central pane displays a catalog of
existing backup jobs at the top and details of each record at the
bottom.