User Manual

117
Power Control
Power Off: Click Power Off and a confirmation window will appear. Decide whether to perform an immediate or a
sequenced power off then click OK to begin. When a UPS or a PDU initiates a sequenced power off, computers
connected to the UPS/PDU/ATS that have Agent or Client installed will initiate shutdown prior to the sequenced
power off.
Note: An immediate power off will likely result in connected computers losing power.
A confirmation window of a PDU power off operation
Power On: Click Power On to have the UPS/PDU/ATS turn on output power. Decide whether to turn on output
power immediately or after a delay in the confirmation window. Click OK to begin.
Note: Some computers require manual booting when a UPS or a PDU powers on. To change this, set the
computers BIOS to boot when power is restored.
A confirmation window of a PDU power on operation
Power Cycle: Initiates a Power Cycle on the UPS/PDU/ATS. This will turn the UPS/PDU/ATS off then back on or
vice versa. Decide whether to initiate an immediate or a sequenced power cycle and click OK to begin. A
sequenced power cycle will cause computers connected to the UPS/PDU/ATS that have Agent or Client installed
to shut down prior to the power cycle.
Note: An immediate power cycle off will likely result in connected computers losing power.
A confirmation window of a PDU power cycle operation