User`s manual
CyberPower Remote Management System
13
of the battery, including the results and date of the last battery test. Click the Initiate button to
begin a battery test.
Performing a battery test is prohibited when the Frequency Working Mode option is set to fixed.
If performing a battery test on the fixed frequency mode, a UPS fault may occur and cause the
UPS to enter bypass mode. The frequency on bypass mode may not be acceptable and damage
the connected equipment.
The results will be reported after a battery test completes.
• Last Test Date: The date the last battery test was performed.
• Last Test Result: The results of the last battery test:
Passed: The battery performs normally during the test.
None: The UPS never performed the battery test.
Failed: The battery test results in failure.
Follow the steps below if the battery test fails:
Repeat the battery test and replace the batteries if the test fails again.
Contact CyberPower for assistance if the battery test fails after the batteries have been
replaced.
Runtime Calibration
The Runtime Calibration ensures the runtime estimate is accurate with the load and the current
battery capacity. The results show the runtime, the results, and the date of the last calibration.
When a runtime calibration is initiated, the connected equipment will be run on battery power
until the batteries are completely discharged. Following the Runtime Calibration, the UPS will
automatically begin recharging the batteries.
Users can click the Start button to initiate a runtime calibration. Click the Cancel button to stop
the runtime calibration. The result will be reported after a calibration is finished or canceled:
• Estimated Runtime: The estimated runtime of the batteries.
• Last Calibration Elapsed Time: The elapsed time of last Runtime calibration..
• Last Calibration Result: The results of the last runtime calibration.
Passed: The runtime calibration is completed and the batteries are good.
None: The UPS never performed a runtime calibration.
Failed: The UPS fails during the runtime calibration.
Canceled: The calibration was interrupted.
• Last Calibration Date: The last date performing the runtime calibration.
Note: 1. It is recommended to perform at least one calibration every 3 months.
2. A complete calibration causes the battery capacity to deplete. Ensure the UPS has
recharged completely after performing a calibration.
[UPS-> Schedule]: Sets the UPS to automatically shutdown and restart at scheduled times,
(one time/per day/per week). The Schedule page manages scheduled shutdowns and lists all
configured schedules. Each schedule row displays the details of when the schedule will take