Specifications

13
Cybex Owner’s Manual
If Then
FT-325cannott
through doorway
13. Remove BHSCS and locknuts, remove one side of connector tubes
using a 7/32” Allen wrench and a 9/16 wrench.
Tube
connector
14. Move machine to desired position.
15. Reattach frame halves and securely tighten the BHSCS.
16. Place two drops of Loctite 242 to each BHSCS and threaded hole
for Chin up bar. Securely tighten BHSCS.
17. Insert plastic plugs.
Securelyanchormachinetotheoor
Cybex strongly recommends to maximize stability, equipment must be secured to a solid level
surface.
WARNING: Anchoring equipment:
• Cybex is not responsible for the actual anchoring of equipment. Consult with a
professional contractor.
• Use fasteners having a minimum of 500 lbs. tensile capacity (3/8’ grade 2 bolts or
better).
• If legs/frame does not contact surface, DO NOT pull down with anchors. Shim
any leg or frame not in contact with surface using at washers.